Suitable for small scale operations i e 50 tph solid liquid separation and washing Capable of leaching gold and base metals ore dependent No milling required – fine crushing application ore dependent Laboratory test work was conducted on DRC copper ores The demonstration pilot plant was constructed and successfully operated